CASA DOS VENTOS PLACES 445 MW ORDER OF V150-4.2 MW TURBINES FOR VESTAS’ LARGEST ORDER TO DATE IN BRA
MADRID -- Casa dos Ventos, one of the pioneers and largest investors in the development of wind projects in Brazil, has placed a 445 MW order for the supply and installation of 106 Vestas V150-4.2 MW wind turbines for the Rio do Vento project in the state of Rio Grande do Norte, Brazil. For the project, Vestas has developed a customized solution for the site’s wind profile, including optimized towers and the V150-4.2 MW turbine’s high capacity factor, offering very competitive cost of energy for Brazil’s free energy market. "The wind resources in Rio do Vento is among the best in the world, which required us to look for the best available technology for the project. We are convinced that Vestas’ solution will allows us to extract the maximum energy out of this region," said Lucas Araripe, Casa dos Ventos Director of Business Development. The project will be Vestas’ largest in Brazil and the second order Casa dos Ventos places with Vestas in less than six months and the largest wind turbine order by the Brazilian developer to date. The nacelles will be manufactured in Vestas’ facility in Ceará, while the blades and towers will also be produced locally in accordance with the rules of FINAME II of the National Development Bank (BNDES).
The contract includes supply, installation and commissioning of the wind turbines, as well as a 20-year Active Output Management 5000 (AOM 5000) service agreement. The project is expected to become operational during the second half of 2021.
With this order, Vestas’ firm order intake for the V150-4.2 MW in Brazil passes 1,500 MW, just eight months after the company announced plans to produce the turbine variant in the Brazilian state of Ceará.